Aerial of Block's Point

Aerial of Block's Point

Welcome to Block's Point Blog!

Block's Point centralized in Granby Township, Nicollet County, MN, can be found on the eastern shore of Swan Lake. This is paradise for us fellow hunters and friends and we would like to share our history and experiences with you!

Also, for other interesting history, please see the history section listed below! Give us a look and post any comments you have. Thanks for the visit!

Block's Point 1927

Block's Point 1927

Plat Map from 1927

Detailed above is the plat map at Block's Point and surrounding area. . .Note the Country School and Swan Lake Pavilion on this plat map and also in greater detail as shown below.

Wednesday, April 27, 2011

The Barn and Crystal Farm's

Built in the 1930's after a fire destroyed the first barn. . .lumber was taken from the woods on Block's Point cut from the saw mill.
My Dad "Robert Larson" made comment many times that he and his Sister "Joy Edwards" sat in the lawn and watched the builders erect the new barn (at this time my Dad was only 6 or 7 years old). . .Robert Larson said that this was the first time he met Herb Volk from St. Peter. He was one of the young men erecting the barn.

Diver Hunt Nov. 7th, 2010 - Group Photo

From left to right. . .Howard Putz, Pat Conroy, Blake Hayden and Dale Larson.

Cackler Blind - South Bay - My friend Richard Theissen

Nov. 7th, 2010 - South Bay diver hunt.

Hangin' out. . .Bag from the 11-07-10 hunt

At the cleaning station.

November 7-South Bay - Diver hunt

Cackler blind in South Bay. . .Pat Conroy returning to the blind after retrieving a downed bird. Does it get any better than this?

Tuesday, December 14, 2010

Steven and Kevin with their bag of ducks. . .Really a great start for the 2010 duck season. A total of nine birds! Not bad for their second season.
Nice. . .We are ready. . .we will keep picking. . .who is going to clean the birds?
Comes with the days hunt. . .time to clean! No problem! These really are some nice birds!
Well, looks like Dad (Bill) has the honors! Boys. . .this is how it is done. . .See, you start here!
These birds look tasty! Is the grill ready?
Yea. . .Breakfast of Champions!

Monday, September 6, 2010

South Point's new WL 2010 Drag King



The new WL 2010 Drag King being tested by the Lead Engineer, Ken Weertz after the 1st stage of manufacturing was complete. The WL 2010 Drag King was design using two W8 x 15 beams with stabilizing/skid angles to maintain proper material drop off at low elevations in the road during operation.
After 20 minutes of planning. . .Manufacturing Specialist Dale Larson performed the welding, while the Lead Engineer took on the roll as Senior Quality Control Manager to ensure proper weldments were to specification. Careful measurements were taken and a super structure jig was used to speed up the manufacturing process.
There are no plans for the Patent as of yet. . .3 years of testing on the South Point road will be required before all of the field testing including the Solid Works models can be submitted.
Click on the movie above for a complete seek peek at the new WL 2010 Drag King!

Sunday, July 11, 2010

Cabin 21
Ooops, how could I forget this one!